DB Hi-Rail Red Line Hi-Rail Access Tunnel
Project Description
MBTA Contract No. Y42CN01
This project will provide a new access point to the Red Line at Alewife Station. The MBTA Red Line subway northwest of the Charles River operates in a below grade tunnel. Maintenance access is four miles from Alewife Station at the First Street gate. The existing tunnel is over 25-ft below ground surface near Alewife.
Documents
Y42CN01 DB Hi-Rail Outreach Memo
Y42CN01 Precluded Firm List
Y42CN01 DB Outreach Meeting 03.18.2026




