UNIVERSITY PARK/ROUTE 128 GARAGE RESTORATION PROJECT, DEDHAM, MASSCHUSETTS
Dedham
| Advertisement Date |
4/7/2021 |
| Pre-Bid Meeting Date & Time | 04/16/2021 at 2:00 PM |
| Bid Opening Date | 5/13/2021 |
| Contract Number | W91CN01 |
| Class | CLASS 1, GENERAL TRANSIT CONSTRUCTION, $5,000,000 AND CLASS 7 – BUILDINGS |
| Project Value | $10,566,736.00 |
| DBE Goal | % |
Scope of Work:
Work consists of the following: Repairs and egress upgrades to the MBTA Route 128 Garage, a four-story structure with a structural steel framing system and precast concrete double tee floors. The garage has 3 supported levels. The repair work includes, but is not limited to, partial and full depth concrete deck repairs including shear connector repairs, application of waterproofing membrane and silane sealer, replacement of joint sealant, replacement of expansion joints, selective replacement of floor drains and plumbing piping, replacement of existing light fixtures and selective conduit replacement, and replacement of control panel and transformer in the emergency electric room. Additionally, the work consists of accessibility and egress upgrades that includes, but is not limited to, a new exterior four-story steel framed stair tower, replacement of existing stair railings, accessibility and egress striping and signage, modifications to the accessible entrance, and a new headhouse at Stair #2.
All PDFs can be viewed with Adobe Acrobat Reader version 4.0 or higher.
View Complete Notice to Bidders
Comparison of Bids Report for Contract W91CN01 (42.80kb) updated Thursday, May 13, 2021
W91CN01 Planholders List
W91CN01 Planholders List (Printer Friendly)
| Apparent Low Bidder | Bid Amount |
| Mccourt Construction Co. Inc | $11,099,531.00 |
| Bid Responses | Bid Amount |
| TRAC Builders Inc. | $11,100,000.00 |
| Sps New England, Inc. | $14,327,556.00 |
| Wes Construction Corp. | $17,628,245.00 |