Vertical Transportation Improvements, Harvard/Central Station
Cambridge, MA
Advertisement Date |
3/24/2017 |
Pre-Bid Meeting Date & Time | April 05, 2017 at 1:00 PM |
Bid Opening Date | 4/26/2017 |
Contract Number | A90CN03 |
Class | CLASS I, GENERAL TRANSIT CONSTRUCTION AND CLASS 7 - BUILDINGS |
Project Value | $7,103,678.00 |
DBE Goal | 15 % |
Scope of Work:
Harvard Square Station: The Work includes but is not limited to replacement of an existing elevator and elevator hoistway which extends from the Red Line central mezzanine lower level up to the plaza in Harvard Square. Adjacent to the elevator at the Red Line level, the existing elevator machine room and equipment will be replaced with new construction. Included is mechanical, electrical, communications, fire alarm and plumbing work to support the design. Site work includes replacing paving adjacent to the new headhouse as shown on the drawings. Central Square Station: The Work includes but is not limited to replacement of an existing elevator and elevator hoistway which extends from the Red Line inbound platform up to grade at Central Square. Adjacent to the elevator at the platform level, the existing elevator machine room and equipment will be replaced with new construction. Included is mechanical, electrical, communications and plumbing work to support the design. Site work includes replacing paving adjacent to the new headhouse as shown on the drawings.
All PDFs can be viewed with Adobe Acrobat Reader version 4.0 or higher.
View Complete Notice to Bidders
Comparison of Bids Report for Contract A90CN03 (8.03kb) updated Wednesday, April 26, 2017
A90CN03 Planholders List
A90CN03 Planholders List (Printer Friendly)
Apparent Low Bidder | Bid Amount |
Bids currently being Tabulated |
Bid Responses | Bid Amount |
Bids currently being Tabulated |