Bidding and Solicitations > Awarded Contracts

Awarded Contract: Q09CN02


<< Back to Awarded MBTA Contracts

Green Line D Branch Track & Signal Replacement – Beaconsfield to Riverside, Newton and Brookline, Massachusetts

Newton and Brookline, Ma

Advertisement Date 5/7/2018
Pre-Bid Meeting Date & Time 05/18/2018 at 10:00 AM
Bid Opening Date 6/19/2018
Contract Number Q09CN02
Class CLASS 1 – GENERAL TRANSIT CONSTRUCTION - $30,000,000.00, CLASS 3 – TRACKWORK - $30,000,000.00, CLASS 6A1 – TRANSIT SIGNALS AND COMMUNICATIONS - $25,000,000.00
Project Value $66,080,000.00
DBE Goal 14 %

Scope of Work:

The work is a part of the MBTA initiative to bring the track and signal system between Beaconsfield Station and Riverside Station into a state of good repair. This segment of the system between Beaconsfield Station and Riverside Station is part of the Green Line's D (Highland) Branch. The signal improvements include replacing the existing obsolete 25Hz track circuits and their associated distributed frequency converter network with modern solid-state 100Hz track circuits powered locally from each control instrument house (CIH). The signal improvements will be achieved by (1) replacing the wayside signal cases with new CIH's (fabricated by the MBTA, installed by the Contractor), (2) providing two new CIH's for the Reservoir and Grove Street interlockings, (3) providing approximately 6.5 miles of new wayside aerial cable and cable support system on existing catenary poles, (4) providing all wayside signals, pushbuttons, power and hand-throw switch machines, and (5) providing all other ancillary signal equipment and other elements necessary for a fully functioning system as shown on the contract plans. Track improvements consist of the renewal of approximately 24,000 feet of mainline track, replacement of special trackwork, platform edge reconstruction, and grade crossing reconstruction.

General Contractor Contract Value
Barletta-Fischbach Green Line D Branch Joint Venture $74,000,000.00

Notice to Proceed Date: 7/23/2018
Projected Completion Date: 1/22/2021

Bid Responses Bid Amount
Barletta-Fischbach Green Line D Branch Joint Venture $74,000,000.00
J. F. White Contracting Co. $79,937,700.00
Sps/Dagle Jv $107,135,700.00

All PDFs can be viewed with Adobe Acrobat Reader version 4.0 or higher.

View Complete Notice to Bidders

View Complete Notice to Bidders (PDF)Comparison of Bids Report for Contract Q09CN02 (83.04kb) updated Tuesday, June 19, 2018

Q09CN02 Planholders List    Q09CN02 Planholders List (Printer Friendly) Q09CN02 Planholders List (Printer Friendly)

Notice
The posting of on-line information on the Massachusetts Bay Transportation Authority Web Page on Massachusetts Bay Transportation Authority construction contracts is being made solely for informational purposes and is subject to change, without notice.

The posting of on-line information shall not be construed as an indication that any person or entity accessing such information is eligible to purchase plans and specifications under M.G.L. c.29, 8B.

The posting of on-line information does not relieve prospective bidders of their obligation to review and become familiar with the Contract Documents, as bid, including, but not limited to, the obligation to inspect plans, specifications and any addenda. The Contract Documents as bid shall supersede and take precedence over any information posted by the Massachusetts Bay Transportation Authority on the Massachusetts Bay Transportation Authority Web Page.

The posting of on-line information does not relieve prospective bidders of their obligation to consult the Central Register published by the Secretary of State's Office pursuant to M.G.L. c. 149 §44J and c.9, §20A for official information concerning any Massachusetts Bay Transportation Authority construction contract. The information published in the Central Register shall supersede and take precedence over any information posted by the Massachusetts Bay Transportation Authority on the Massachusetts Bay Transportation Authority Web page.

Bidders are advised that they should have representation at this tour as no extra visits are planned.