PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975
<<Back to Construction Bid Solicitations
Please review the complete notice to bidders to access the full legal version of this solicitation.
| Project Name | South Station Crew Base |
| Project Location | Boston, MA |
| Contract Number | F79CN01 |
| Class | 7 - BUILDINGS |
| Project Value | $5,300,000.00 |
Scope of Work
The space is approximately 6,000 SF and located within the basement of the concourse area. The space will serve train operators (40-60 employees) before and after shifts with quiet areas, bathroom facilities, common kitchen, and office areas. The program is to include space for Terminal Operations for employee check-in/out. The existing space is a below grade “shell” space with concrete, steel and CMU construction. Existing utilities and structure (to remain) are exposed in the space. The scope of work includes interfacing with existing structure and systems, including extending or adding MEP/FP systems as required.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 11/05/2026 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Bid Opening Link: https://teams.microsoft.com/meet/246752182986572?p=Iwq8hjuSH3FrrTzmym
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
| Project Manager | Naresh Kapil 10 Park Plaza, Boston, MA 02116 |
| Email Address | nkapil@mbta.com |
| Site Tour Date & Time* | 10/22/2026 at 10:00 AM |
| Site Tour Location | Dunkin Donuts, South Station Concourse |
| Pre-Bid Meeting Date & Time ** | 10/22/2026 at 1:00 PM |
| Pre-Bid Meeting Location | Virtual |
| Documents Available | 10/07/2026 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.




