Project NameSouth Station Crew Base
Project LocationBoston, MA
Contract NumberF79CN01
Class7 - BUILDINGS
Project Value$5,300,000.00

Scope of Work

The space is approximately 6,000 SF and located within the basement of the concourse area. The space will serve train operators (40-60 employees) before and after shifts with quiet areas, bathroom facilities, common kitchen, and office areas. The program is to include space for Terminal Operations for employee check-in/out. The existing space is a below grade “shell” space with concrete, steel and CMU construction. Existing utilities and structure (to remain) are exposed in the space. The scope of work includes interfacing with existing structure and systems, including extending or adding MEP/FP systems as required.

Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.

Send Sealed Bids to:

All bids must be submitted electronically at: www.Bidx.com

Bids Must Be Received By: 11/05/2026 At 2:00 PM

Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Bid Opening Link: https://teams.microsoft.com/meet/246752182986572?p=Iwq8hjuSH3FrrTzmym

Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:

Project ManagerNaresh Kapil
10 Park Plaza, Boston, MA 02116
Email Addressnkapil@mbta.com
Site Tour Date & Time*10/22/2026 at 10:00 AM
Site Tour LocationDunkin Donuts, South Station Concourse
Pre-Bid Meeting Date & Time **10/22/2026 at 1:00 PM
Pre-Bid Meeting LocationVirtual
Documents Available10/07/2026

*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.