PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975
<<Back to Construction Bid Solicitations
Please review the complete notice to bidders to access the full legal version of this solicitation.
| Project Name | Replacement of Fire Alarm and Suppression System at Andrew Station |
| Project Location | Boston, MA |
| Contract Number | Z99CN02 |
| Class | 5 - ELECTRICAL |
| Project Value | $3,400,000.00 |
| DBE Goal | 0% |
Scope of Work
The work consists of the replacement of the existing Sprinkler and Fire Alarm System with a new Sprinkler System and new Fire Alarm System. All work will be performed in accordance with NFPA 13 and 780 CMR Chapter 9: Fire Protection Systems.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 11/13/2025 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Bid Opening Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_NDA4M2NkZDgtNzE5NC00YzFlLThjY2QtMjE5ZmU1MTE1MGNh%40thread.v2/0?context=%7b%22Tid%22%3a%227558e599-f006-481f-9717-b189e6730862%22%2c%22Oid%22%3a%229d7658f3-a6c8-47cc-9d59-25fe42a32e61%22%7d
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
| Project Manager | Oscar Salcedo 10 Park Plaza, Boston, MA 02116 |
| Telephone Number | 857-260-2294 |
| Email Address | osalcedo@mbta.com |
| Site Tour Date & Time* | 10/02/2025 at 10:00 AM |
| Site Tour Location | Andrew Square Station |
| Pre-Bid Meeting Date & Time ** | 10/02/2025 at 3:00 PM |
| Pre-Bid Meeting Location | Virtual |
| Documents Available | 09/17/2025 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.




