
PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975
<<Back to Construction Bid Solicitations
Please review the complete notice to bidders to access the full legal version of this solicitation.
Project Name | MBTA Phase 2B- Systemwide Transformer Replacement |
Project Location | Boston, Cambridge, Newton, Quincy & Brookline, Massachusetts |
Contract Number | P62CN01 |
Class | 5 - ELECTRICAL |
Project Value | $9,540,110.00 |
DBE Goal | 12% |
Scope of Work
The work comprises electrical, civil, structural and architectural construction services for the replacement of 11 rectifier-transformers and associated items. The work of this Contract includes but is not limited to equipment procurement, furnishing all necessary labor and material to the complete and satisfactory execution of the Work in conformance with Drawings and Specifications for the Phase 2B – Systemwide Transformer Replacement Project.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 4/30/2019 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
Project Manager | Robert Craffey 10 Park Plaza Suite 5170, Boston Ma, MA 02116 |
Telephone Number | 617-222-5348 |
Email Address | rcraffey@MBTA.com |
Site Tour Date & Time* | 03/29/2019 at 7:00 AM |
Site Tour Location | bidders are requested to be present in front of the Riverside Substation at MBTA Riverside Station, Grove Street, Auburndale, MA 02466 |
Pre-Bid Meeting Date & Time ** | 03/29/2019 at 1:00 PM |
Pre-Bid Meeting Location | Capital Delivery Deparment, 10 Park Plaza, Suite 5170, Boston, Ma |
Documents Available | 03/18/2019 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.