
PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975
<<Back to Construction Bid Solicitations
Please review the complete notice to bidders to access the full legal version of this solicitation.
Project Name | Roofing Single-Ply, Systemwide |
Project Location | Boston |
Contract Number | S01CN08 |
Class | CLASS 1 – GENERAL TRANSIT CONSTRUCTION, $5,000,000.00; CLASS 7 – BUILDINGS, $10,000,000.00 |
Project Value | $14,168,000.00 |
Scope of Work
This project will provide replacement roofs at six (6) MBTA facilities. Projects will replace roofing in its entirety. Work will include repairs of the structural decking beneath, protection/walkway pads at perimeter of all rooftop mechanical equipment, and addition of fall protection systems and ladders. Additionally, access hatches, scuppers and skylights will be repaired or replaced.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 1/23/2019 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
Project Manager | Christopher R. Hanlon 10 Park Plaza, Boston, MA 02116 |
Telephone Number | 617-222-5350 |
Email Address | chanlon@mbta.com |
Site Tour Date & Time* | 01/08/2019 at 10:00 AM |
Site Tour Location | Fellsway Operators’ Lobby at 447 Salem Street, Medford Massachusetts |
Pre-Bid Meeting Date & Time ** | 01/08/2019 at 10:00 AM |
Pre-Bid Meeting Location | Fellsway Operators’ Lobby at 447 Salem Street, Medford Massachusetts |
Documents Available | 12/17/2018 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.