Project Name | Knowledge Corridor - Northampton Underpass Project |
Project Location | Northampton, Ma |
Contract Number | T92CN01 |
Class | 1 - GENERAL TRANSIT CONSTRUCTION |
Project Value | $4,806,200.00 |
DBE Goal | 18% |
Scope of Work
As part of the American Recovery and Reinvestment Act (ARRA) High-Speed and Intercity Passenger Rail program, the Knowledge Corridor - Restore Vermonter Project restored intercity passenger rail service on the Pan Am Southern (Pan Am) Connecticut River Main Line (CRML) between Springfield, Massachusetts and White River Junction, Vermont. Work on the Knowledge Corridor Underpass Project generally consists of the construction of a precast concrete underpass structure to accommodate a bike path beneath the CRML in Northampton, Massachusetts.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 3/30/2016 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
Project Manager | John Doherty 100 Summer Street, Boston, MA 02110 |
Telephone Number | 617-750-3220 |
Site Tour Date & Time* | February 24, 2016 at 10:00 AM |
Site Tour Location | rear of National Grid substation adjacent to 203 King Street (US-5) in Northampton, Ma |
Pre-Bid Meeting Date & Time ** | March 01, 2016 at 10:00 AM |
Pre-Bid Meeting Location | 100 Summer St, Suite 1200, Boston, MA 02110 |
Documents Available | February 16, 2016 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.