PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975
<<Back to Construction Bid Solicitations
Please review the complete notice to bidders to access the full legal version of this solicitation.
Project Name | SILVER LINE COURTHOUSE STATION NORTHEAST HEADHOUSE |
Project Location | Boston, MA |
Contract Number | E59CN01 |
Class | CLASS 1, GENERAL TRANSIT CONSTRUCTION, $3,000,000 AND CLASS 7 – BUILDINGS, $11,000,000 |
Project Value | $14,500,000.00 |
Scope of Work
The work consists of the construction of two new headhouses, one with a two-stop BCIL elevator and the second containing a transit rated escalator and stairs. Both headhouses will be of curtainwall on stone veneer concrete base plinth with flat roofs and both will be equipped with a demountable flood control panel sytsem outside the door thresholds. Both headhouses will provide access from the sidewalk level to the existing Courthouse Station concourse. There is electrical and mechanical work to tie in to the existing Station infrastructure. After the headhouses are granted TCO’s the last phase will be to demolish the existing emergency egress stair and exterior headhouse enclosure.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 2/11/2021 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
Project Manager | Tom Rovero 10 Park Plaza, Boston, MA 02110 |
Telephone Number | 617-780-8136 |
Email Address | trovero@mbta.com |
Site Tour Date & Time* | 12/10/2020 at 10:00 AM |
Site Tour Location | Bidders are requested to be present in front of the Courthouse Station South Headhouse at 65 Seaport Blvd and Thompson Place, Boston, Massachusetts |
Pre-Bid Meeting Date & Time ** | 12/09/2020 at 2:00 PM |
Pre-Bid Meeting Location | a virtual on-line meeting |
Documents Available | 12/01/2020 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.