Project Name | South Coast Rail, Fall River Secondary Commuter Rail Expansion Project |
Project Location | Berkley to Fall River, MA |
Contract Number | K78CN03 |
Class | CLASS 1 – GENERAL TRANSIT CONSTRUCTION $50,000,000, CLASS 3 – TRACK WORK, $30,000,000, CLASS 7 – BUILDINGS, $10,000,000 |
Project Value | $164,561,323.00 |
Scope of Work
The Work involves three major elements: (1) the construction of approximately twelve miles of new trackway along the existing Fall River Secondary right of way from Berkley to Fall River, (2) the construction of two commuter rail passenger stations, and (3) the construction of an end of the line layover facility.
Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.
Send Sealed Bids to:
All bids must be submitted electronically at: www.Bidx.com
Bids Must Be Received By: 5/7/2020 At 2:00 PM
Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.
Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:
Project Manager | Kim Dobosz 10 Park Plaza, Boston MA, MA 02110 |
Telephone Number | 617-222-4332 |
Email Address | kdobosz@mbta.com |
Site Tour Date & Time* | 03/04/2020 at 1:00 PM |
Site Tour Location | Bidders are requested to be present in front of the future Freetown Station site 161 South Main Street, Freetown, Massachusetts |
Pre-Bid Meeting Date & Time ** | 03/04/2020 at 9:00 AM |
Pre-Bid Meeting Location | Transportation Board Room, 10 Park Plaza, 2nd Floor, Boston, MA 02116 |
Documents Available | 02/18/2020 |
*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.