Bidding and Solicitations > Design & Construction > Construction Bid Solicitation

PUBLIC ANNOUNCEMENT
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
TRANSPORTATION BUILDING
10 PARK PLAZA
BOSTON, MASSACHUSETTS 02116-3975


<<Back to Construction Bid Solicitations

Please review the complete notice to bidders to access the full legal version of this solicitation.

Project NameSouth Coast Rail, Fall River Secondary Commuter Rail Expansion Project
Project LocationBerkley to Fall River, MA
Contract NumberK78CN03
ClassCLASS 1 – GENERAL TRANSIT CONSTRUCTION $50,000,000, CLASS 3 – TRACK WORK, $30,000,000, CLASS 7 – BUILDINGS, $10,000,000
Project Value$164,561,323.00

Scope of Work

The Work involves three major elements: (1) the construction of approximately twelve miles of new trackway along the existing Fall River Secondary right of way from Berkley to Fall River, (2) the construction of two commuter rail passenger stations, and (3) the construction of an end of the line layover facility.

Note: Contract specifications and drawings are available for download from an MBTA FTP site.
Click here to be put on the Planholders list, and request a copy of the contract specifications and drawings.

Send Sealed Bids to:

All bids must be submitted electronically at: www.Bidx.com

Bids Must Be Received By: 5/7/2020 At 2:00 PM

Immediately thereafter, the Bids will be opened and read publicly on a virtual on-line meeting.

Authorization for the Bidders to view the site of work on the MBTA's property shall be obtained by:

Project ManagerKim Dobosz
10 Park Plaza, Boston MA, MA 02110
Telephone Number617-222-4332
Email Addresskdobosz@mbta.com
Site Tour Date & Time*03/04/2020 at 1:00 PM
Site Tour LocationBidders are requested to be present in front of the future Freetown Station site 161 South Main Street, Freetown, Massachusetts
Pre-Bid Meeting Date & Time **03/04/2020 at 9:00 AM
Pre-Bid Meeting LocationTransportation Board Room, 10 Park Plaza, 2nd Floor, Boston, MA 02116
Documents Available02/18/2020

*. Bidders are advised that they should have representation at this tour as no extra visits are planned.
**. Any request for interpretation of the Plans and Specifications should be submitted in writing at the same time.